The Executive Committee of the National Economic Council (ECNEC) has approved a Tk690 crore project to rehabilitate coastal polders 64/2A and 64/2B in Pekua, Cox’s Bazar.

The project is expected to reduce long-standing risks of flooding, tidal surges, river erosion and waterlogging, while improving the livelihoods and local economy of coastal communities.

Under the project, vulnerable embankments will be rehabilitated and strengthened, water-control infrastructure modernised, and drainage and irrigation systems improved. The measures are expected to protect farmland, salt fields, fish farms, homes and local livelihoods.

According to the Bangladesh Water Development Board (BWDB), the two polders were built between 1961 and 1966 and have a combined 130.24km of embankments. Polder 64/2A has 34.48km and 64/2B has 95.76km of embankments.

The two polders have 49 sluice gates, according to earlier records, including 16 in 64/2A and 33 in 64/2B.

The project covers 139.68 square kilometres, including one municipality, six unions, 11 mouzas and 222 villages. Polder 64/2A covers 3,750 hectares and 64/2B covers 7,736 hectares.

As the embankments have not undergone major rehabilitation for years, several sections have weakened. River erosion, tidal water entering settlements, and monsoon waterlogging have repeatedly damaged cropland, salt fields, fish farms, roads, and homes.

Under the project, 400 metres of embankment between chainages 37.650 and 38.050km and another 710 metres between 46.115 and 46.825km will be rehabilitated in Barbakia under Polder 64/2A.

In Polder 64/2B, work will be carried out on 105 metres in Rajakhali, 30 metres in Moulvirpara, 41 metres in Madhya Mehernama, 25 metres in Tekpara, 63 metres at Karimdad Mia Ghat and 33 metres in Saratghona.

In a Facebook post following the approval, Saeed Ibrahim Ahmed said strengthening embankments, re-excavating canals and modernising drainage and irrigation systems would bring significant improvements to agriculture, the economy and disaster resilience in Pekua and greater Chakaria.

Local residents welcomed the approval but called for the work to begin quickly. They also urged the authorities to ensure transparency and quality, giving priority to the most vulnerable embankments and dysfunctional sluice gates.

They hope proper implementation of the project will significantly reduce the long-standing hardships coastal communities face.

Cox’s Bazar Life Report